Your current position:Home < NEWS < NEWS

March 31 to the Zhongshan factory floor loading

 

    For experienced and professional workers who engaged in logistics, The first thing we should to guide customers how to prepare before the loading. Operational procedures are as follows:Firstly,offer size of Chinese truck& Kazakhstan’s to factory,and then we design the plan for loading in accordance with the size of vehicle,At the same time,we should list precautions to factory,which can reduce the loading time.

    Figure 1 for the vehicle arrived factory  

                       

 

   There is a worker who will guide how to put the cargo.  

                         

    put small items in the middle,large items put on boths

  

    Finish loading for the first factory(the truck needs to be filled for both deliveries)

                         

    Check loading, and particular attention for around the cargo in truck.

  

 

 

    After everything checked out,then we start reinforcement.Due to the fragile goods, which will covered by a piece of wood for reinforced.

   (this process is to be completed by the drivers.)

  

  

    The second loading

                          

    Loading has been completed.The 17.5m wagons can be loaded with 140 CBM of cargo!

                           

    The driver will use four layers of waterproof cover the whole goods, which will be very effective for Water-proof& Anti-Theft.

    (This process need takes 2 hours.)

  

  

 

    According to the rules,we need take the drivers photos,as well as the truck.